We've finally hit a wall. There is just not enough time, or money, to do everything we want. It feels a little overwhelming to think about all of the things, so I'm going to make a very public list and hopefully turn it into a completed projects list over the next year or two. To make myself feel better, I'm also going to make a list of things we've done so far.
Outside:
We've already....
1. Built a chicken coop.
2. Put in a horseshoe pit (not a necessity, but fun nonetheless!).
3. Assembled a raised bed garden.
4. Planted things in said garden (specifically: onions, green beans, cherry and roma tomatoes, zucchini, cucumbers, watermelons, kale, lettuce, arugula and beets).
5. Planted tulips out front.
6. Weeded the brick walkway.
7. Weeded the brick walkway.
8. Weeded the brick walkway.
9. Put up new exterior light fixtures.
We need to...
1. Weed things beside the brick walkway.
2. Put down that weed cloth and mulch around the house.
3. Finish the herb garden project.
4. Pressure wash all the things.
5. Reattach a shutter that I found in the yard after a particularly windy storm.
Inside (get pumped):
Living Room still needs:
1. Ceiling Paint.
2. Outlet/light switches
3. Some kind of storage solution for DVD's (built-ins?)
4. New carpet (which, by the by, I just found out how much that costs... Eek.).
Living Room has:
1. New paint
2. New throw pillows/blankets
3. New decorations.
Dining Rooms needs:
1. Storage for serving dishes, china and table linens (built-ins or hutch?)
2. Ceiling Paint.
3. Large Curtain Rod
4. New window treatment.
5. Hard flooring.
Dining Room has:
1. New table and chairs
2. New paint
3. New large curtains.
Kitchen needs:
1. Ceiling paint
2. Finish the regular paint
3. New sink (...Okay, I want this, our sink is technically fine).
4. New counter tops (Soapstone... someday!).
5. Storage window seat.
Kitchen has:
1. New appliances
2. Pendant lights
3. New snazzy spice rack thanks to handy husband.
Hallway needs:
1. Paint.
2. Decoration.
3. Some kind of mail center/key rack concept.
Half bath needs:
1. New sink/vanity or storage.
2. New toilet.
3. Touch-up on the paint job.
Half bath has:
1. New paint!
2. Pretty decorations.
Stairs need:
1. New runner/carpet
2. Paint
3. Possibly paint on the rails/steps? I've seen some neat ideas I want to try.
And thats just the downstairs!!
Upstairs we have four bedrooms and two baths and some miscellaneous closets.
Master suite:
Has nothing.
Needs:
1. New paint
2. Window Treatments
3. Closet update to be more useful
4. A shower in the master bath (it's only a tub!).
Hallway needs:
1. New paint
Bedrooms need:
1. Paint
2. Window treatments
3. Light switches
4. Miscellaneous furniture items.
So I'm off to research all over Pinterest, Craigslist and Homegoods! If you've found a site or other place you like for house updates, let me know in the comments section!